PT Supreme Energy on the record
5 project records across 1 country, 476 MW where capacity is stated. 176 MW is operating, 300 MW under construction. Counted from records that each name their public source; nothing here is written by or for PT Supreme Energy.
- Records
- 5
- Capacity on record
- 476 MW
- Operating
- 176 MW
- 2 records
- Under construction
- 300 MW
- 3 records
- Countries
- 1
- Checked against owner
- 0
- not yet
Is this your portfolio? Claim a record to correct it, add what is missing, or have it removed. Free, and your contact details are never shown.
Watch PT Supreme Energy. One email when a record here moves stage, is corrected, or is added or retired.
By country
| Indonesia | 5 | 476 MW |
By technology and stage
Largest PT Supreme Energy projects on record
Where these records come from
Licences and terms for each dataset are on the sources page. Solandor does not grade projects or developers; it counts what is published and links where.
These records as a file
Rows from redistributable sources only, CC BY 4.0, issued to a work email.
Questions about PT Supreme Energy
How many clean energy projects does PT Supreme Energy have on record?+
5 records across 1 country name PT Supreme Energy as developer or owner, 476 MW in total where capacity is stated. 2 operating, 3 under construction. Each record cites the public dataset it was taken from; ownership shares and consortium partners are on the record itself.
What is the largest PT Supreme Energy project on record?+
By stated capacity, Rajabasa geothermal power plant 1.0 in Indonesia at 110 MW, under construction. Solandor ranks by the capacity figure in the source record and does not adjust for ownership share, so a partner's stake in a joint project counts the whole project here.
Is this PT Supreme Energy's own list of projects?+
No. It is every record in a public catalogue that names PT Supreme Energy, compiled from the datasets listed on this page. PT Supreme Energy can claim any record free of charge to correct it, add what is missing, or have it removed; contact details never appear on the public site.