Azure Power on the record
45 project records across 1 country, 5.0 GW where capacity is stated. 3.1 GW is operating, 945 MW under construction. Counted from records that each name their public source; nothing here is written by or for Azure Power.
Also recorded as Azure Power (Rajasthan) Private Limited.
- Records
- 45
- Capacity on record
- 5.0 GW
- Operating
- 3.1 GW
- 28 records
- Under construction
- 945 MW
- 9 records
- Countries
- 1
- Checked against owner
- 0
- not yet
Download these records as CSV (records from redistributable sources only; CC BY 4.0, attribute the source on each row). Is this your portfolio? Claim a record to correct it, add what is missing, or have it removed. Free, and your contact details are never shown.
Watch Azure Power. One email when a record here moves stage, is corrected, or is added or retired.
By country
| India | 45 | 5.0 GW |
By technology and stage
Largest Azure Power projects on record
Every record, by stage
Operating 22
- Chhattargarh solar farmIndia · 150 MW
- Andhra Pradesh 2 solar farmIndia · 130 MW
- Telangana 1 solar farmIndia · 128 MW
- Karnataka 4 solar farm 1India · 75 MW
- Karnataka 4 solar farm 2India · 75 MW
- Assam 1 solar farm 2India · 65 MW
- Andhra Pradesh 3 solar farmIndia · 59 MW
- Uttar Pradesh 2 solar farmIndia · 59 MW
- Punjab 4 solar farm 1India · 52 MW
- Punjab 4 solar farm 2India · 52 MW
- Punjab 4 solar farm 3India · 52 MW
- Uttar Pradesh 3 solar farmIndia · 51 MW
- Andhra Pradesh 1 solar farmIndia · 50 MW
- Rajasthan 3 solar farm 2India · 43 MW
- Rajasthan 3 solar farmIndia · 41 MW
- Kathauti 2 Solar Power PlantIndia · 40 MW
- Nagaur solar farm 2India · 35 MW
- Lambi solar farmIndia · 34 MW
- Assam 1 solar farmIndia · 32 MW
- Punjab 3 solar farm 1India · 25 MW
- Rajasthan 3 solar farm 1India · 23 MW
- Kathauti 1 Solar Power PlantIndia · 5 MW
Under Construction 7
- Karnataka (Azure) wind farmIndia · 120 MW
- Jodhpur Manufacturing (Azure Power) solar farm 1India · 100 MW
- Karnataka Hybrid (Azure) wind farmIndia · 50 MW
- Jodhpur Manufacturing (Azure Power) solar farm 4India · 50 MW
- Jodhpur Manufacturing (Azure Power) solar farm 5India · 50 MW
- SECI Tranche-IV (Azure) hybrid solar farm KarnatakaIndia · 38 MW
- SECI Tranche-IV (Azure) hybrid solar farm RajasthanIndia · 38 MW
In Development 8
- Jaisalmer Manufacturing (Azure Power) solar farm 1India · 125 MW
- Jaisalmer Manufacturing (Azure Power) solar farm 2India · 125 MW
- Jaisalmer Manufacturing (Azure Power) solar farm 3India · 125 MW
- Jaisalmer Manufacturing (Azure Power) solar farm 4India · 125 MW
- Jaisalmer Manufacturing (Azure Power) solar farm 5India · 125 MW
- Jaisalmer Manufacturing (Azure Power) solar farm 6India · 125 MW
- Jaisalmer Manufacturing (Azure Power) solar farm 7India · 125 MW
- Jaisalmer Manufacturing (Azure Power) solar farm 8India · 125 MW
Where these records come from
- Global Energy Monitor, Global Solar Power Tracker
- Global Wind Power Tracker, Global Energy Monitor
- Global Power Plant Database v1.3.0, World Resources Institute
Licences and terms for each dataset are on the sources page. Solandor does not grade projects or developers; it counts what is published and links where.
Questions about Azure Power
How many clean energy projects does Azure Power have on record?+
45 records across 1 country name Azure Power as developer or owner, 5.0 GW in total where capacity is stated. 28 operating, 9 under construction, 8 in development. Each record cites the public dataset it was taken from; ownership shares and consortium partners are on the record itself.
What is the largest Azure Power project on record?+
By stated capacity, Rajasthan 6 solar farm 1 in India at 450 MW, operating. Solandor ranks by the capacity figure in the source record and does not adjust for ownership share, so a partner's stake in a joint project counts the whole project here.
Is this Azure Power's own list of projects?+
No. It is every record in a public catalogue that names Azure Power, compiled from the datasets listed on this page. Azure Power can claim any record free of charge to correct it, add what is missing, or have it removed; contact details never appear on the public site.