Dhalkebar solar project III
Developer undisclosed
A solar project record in Nepal on Solandor, a free database of clean energy projects and the investors who fund them across the Gulf, South Asia and South East Asia. Browse the full catalogue.
- Capacity
- 1 MW
- Technology
- Solar
- Stage
- Operational
- Country
- Nepal
- Location
- 26.9200, 85.9439
- Developer
- not published
- Annual output
- not published
- Capex
- not published
- Capital sought
- not published
- Source
- Global Energy Monitor, Global Solar Power Tracker
- Last checked
- 10 Sept 2026
Every field this catalogue holds for the record is listed, including the ones its source leaves empty. A blank is a gap in the published source, not a gap in the record.
Ours is a public-source record. Claim it to correct anything above. Free, and your contact details are never shown.
About this project
1 MW solar facility in Nepal currently operating. Compiled from the Global Energy Monitor tracker; financial terms are not published and must be obtained from the developer. [possible duplicate of tjazzvxqv7jqkbv0sft4j01y (Mithila Solar PV Station), 1.68 km away, a different name within 2 km. 1 MW against None MW. Check before publishing.]
Where this sits in the catalogue
This is one of 3 units recorded at this site, alongside Dhalkebar solar project I and Dhalkebar solar project II. Each is held as its own record because each is separately reported. By capacity this is the 147th largest of the 160 solar records we hold in Nepal. The country has 394 records in total across every technology. A further 14 catalogued projects sit within 25 km of it. See every record in Nepal or find it on the map.
Investment readiness
What a financier can currently see about this project without asking a question. Not a view on the project itself.
No score is shown, because the public record carries too little to score one honestly. A low band here would describe what we do not know rather than anything about the project. The dimensions below are what the sources actually evidence, and the gaps are what a developer can close in a minute by claiming the record.
To become bankable
- Secure an offtake agreement (PPA) or named offtaker
- Secure site control (ownership or lease)
- Apply for grid connection / evacuation
- Provide developer track record / prior projects
- Add a CAPEX budget
- Add an expected annual generation estimate
Climate impact
Clean generation displaces grid power at 0.28 tCO₂/MWh. Generation estimated from capacity.
CO₂ avoided / yr
491 t
Over project life
12k t
Homes powered / yr
501
We hold no contact route for this project
This record comes from a public dataset, and that dataset does not publish a way to reach the developer. You can still register interest and we will tell you if that changes, but we will not pretend an introduction is available today.
If this is your project, claim the record and investors can reach you directly.
Is this your project?
This record is drawn from a public source. Claim it to correct it, state whether it is raising, and choose whether investors may be introduced to you. Nothing is published until we have checked it, and your contact details are never shown.
If you would rather not be listed at all, email hello@solandor.co and we will remove the record. No account, no form, and we do not ask why.
Claim this projectDeveloper site: www.gem.wiki/Dhalkebar_2_solar_project
The Capital Radar
Told when Dhalkebar solar project III changes
The Capital Radar goes out when the record moves: stages that shift, figures that are corrected, records that are added or retired across Nepal. Every number traced to the public dataset it came from.
Free. One click to leave, and we never pass your address on.
Questions about Dhalkebar solar project III
How big is Dhalkebar solar project III?+
Dhalkebar solar project III is recorded at 1 MW of solar capacity in Nepal. That figure is the one its source publishes, not an estimate by Solandor.
Where is Dhalkebar solar project III?+
Dhalkebar solar project III is in Nepal, at 26.9200, 85.9439. The coordinates are published by the source, so the location on the map is the site itself rather than a town centre standing in for it.
Is Dhalkebar solar project III operating?+
Dhalkebar solar project III is recorded at operational stage in Nepal. Stage comes from the source dataset and is re-checked against it; the page shows the date of the last check, so you can see how current that is.
Where does Solandor's information about Dhalkebar solar project III come from?+
This record is drawn from Global Energy Monitor, Global Solar Power Tracker, published at https://globalenergymonitor.org/projects/global-solar-power-tracker/. Solandor is a free public catalogue of clean energy projects and their funders; every field it holds is shown, including the ones the source leaves empty. Tell us if anything is wrong and we will correct it, and if you are Dhalkebar solar project III and would rather not be listed at all, say so and we will remove it.