Festival Mall Solar Rooftop Project --
Developer undisclosed
A solar project record in Philippines on Solandor, a free database of clean energy projects and the investors who fund them across the Gulf, South Asia and South East Asia. Browse the full catalogue.
- Capacity
- 2.3 MW
- Technology
- Solar
- Stage
- Operational
- Country
- Philippines
- Location
- Muntinlupa14.389, 121.045
- Developer
- not published
- Annual output
- not published
- Capex
- not published
- Capital sought
- not published
- Source
- Global Energy Monitor, Global Solar Power Tracker
- Last checked
- 10 Sept 2026
Every field this catalogue holds for the record is listed, including the ones its source leaves empty. A blank is a gap in the published source, not a gap in the record.
Ours is a public-source record. Claim it to correct anything above. Free, and your contact details are never shown.
About this project
2.3 MW solar facility at Muntinlupa, Philippines currently operating. Compiled from the Global Energy Monitor tracker; financial terms are not published and must be obtained from the developer.
Where this sits in the catalogue
By capacity this is the 409th largest of the 440 solar records we hold in the Philippines. The country has 990 records in total across every technology. A further 28 catalogued projects sit within 25 km of it. See every record in the Philippines or find it on the map.
- San Pedro Floating Solar Power Project --2 km
- Robinsons Galleria South Roof-Mounted Solar Energy Project --4 km
- GigaWind1 Floating Solar Power Plant Project --5 km
- Cabuyao 5 Floating solar farm --13 km
- Mitsubishi Motors Philippines Corporation Solar Power Project --14 km
- SM Sta. Rosa Solar Rooftop Power Project --14 km
Investment readiness
What a financier can currently see about this project without asking a question. Not a view on the project itself.
No score is shown, because the public record carries too little to score one honestly. A low band here would describe what we do not know rather than anything about the project. The dimensions below are what the sources actually evidence, and the gaps are what a developer can close in a minute by claiming the record.
To become bankable
- Secure an offtake agreement (PPA) or named offtaker
- Secure site control (ownership or lease)
- Apply for grid connection / evacuation
- Provide developer track record / prior projects
- Add a CAPEX budget
- Add an expected annual generation estimate
Climate impact
Clean generation displaces grid power at 0.65 tCO₂/MWh. Generation estimated from capacity.
CO₂ avoided / yr
2,619 t
Over project life
65k t
Homes powered / yr
1,151
We hold no contact route for this project
This record comes from a public dataset, and that dataset does not publish a way to reach the developer. You can still register interest and we will tell you if that changes, but we will not pretend an introduction is available today.
If this is your project, claim the record and investors can reach you directly.
Is this your project?
This record is drawn from a public source. Claim it to correct it, state whether it is raising, and choose whether investors may be introduced to you. Nothing is published until we have checked it, and your contact details are never shown.
If you would rather not be listed at all, email hello@solandor.co and we will remove the record. No account, no form, and we do not ask why.
Claim this projectDeveloper site: www.gem.wiki/Festival_Mall_Solar_Rooftop_Project
The Capital Radar
Told when Festival Mall Solar Rooftop Project -- changes
The Capital Radar goes out when the record moves: stages that shift, figures that are corrected, records that are added or retired across Philippines. Every number traced to the public dataset it came from.
Free. One click to leave, and we never pass your address on.
Questions about Festival Mall Solar Rooftop Project --
How big is Festival Mall Solar Rooftop Project --?+
Festival Mall Solar Rooftop Project -- is recorded at 2.3 MW of solar capacity in Muntinlupa, Philippines. That figure is the one its source publishes, not an estimate by Solandor.
Where is Festival Mall Solar Rooftop Project --?+
Festival Mall Solar Rooftop Project -- is in Muntinlupa, Philippines, at 14.3893, 121.0449. The coordinates are published by the source, so the location on the map is the site itself rather than a town centre standing in for it.
Is Festival Mall Solar Rooftop Project -- operating?+
Festival Mall Solar Rooftop Project -- is recorded at operational stage in Philippines. Stage comes from the source dataset and is re-checked against it; the page shows the date of the last check, so you can see how current that is.
Where does Solandor's information about Festival Mall Solar Rooftop Project -- come from?+
This record is drawn from Global Energy Monitor, Global Solar Power Tracker, published at https://globalenergymonitor.org/projects/global-solar-power-tracker/. Solandor is a free public catalogue of clean energy projects and their funders; every field it holds is shown, including the ones the source leaves empty. Tell us if anything is wrong and we will correct it, and if you are Festival Mall Solar Rooftop Project -- and would rather not be listed at all, say so and we will remove it.