Mohammed Bin Rashid Al Maktoum Solar Park 5a
Dubai Electricity and Water Authority PJSC [100%]
A solar project record in United Arab Emirates on Solandor, a free database of clean energy projects and the investors who fund them across the Gulf, South Asia and South East Asia. Browse the full catalogue.
- Capacity
- 300 MW
- Technology
- Solar
- Stage
- Operational
- Country
- United Arab Emirates
- Location
- Emirate of Dubai24.727, 55.411
- Developer
- Dubai Electricity and Water Authority PJSC [100%]
- Annual output
- not published
- Capex
- not published
- Capital sought
- not published
- Source
- Global Energy Monitor, Global Solar Power Tracker
- Last checked
- 10 Sept 2026
Every field this catalogue holds for the record is listed, including the ones its source leaves empty. A blank is a gap in the published source, not a gap in the record.
Ours is a public-source record. Claim it to correct anything above. Free, and your contact details are never shown.
About this project
300 MW solar facility at Emirate of Dubai, United Arab Emirates currently operating. Owner: Dubai Electricity and Water Authority PJSC [100%]. Start year: 2021. Compiled from the Global Energy Monitor tracker; financial terms are not published and must be obtained from the developer. [possible duplicate of prj_osm_relation12163496, 3.07 km away with the same name. Check before publishing.]
Where this sits in the catalogue
By capacity this is the 17th largest of the 43 solar records we hold in the United Arab Emirates. The country has 61 records in total across every technology. A further 9 catalogued projects sit within 25 km of it. See every record in the United Arab Emirates or find it on the map.
Investment readiness
What a financier can currently see about this project without asking a question. Not a view on the project itself.
No score is shown, because the public record carries too little to score one honestly. A low band here would describe what we do not know rather than anything about the project. The dimensions below are what the sources actually evidence, and the gaps are what a developer can close in a minute by claiming the record.
To become bankable
- Secure an offtake agreement (PPA) or named offtaker
- Secure site control (ownership or lease)
- Apply for grid connection / evacuation
- Provide developer track record / prior projects
- Add a CAPEX budget
- Add an expected annual generation estimate
Climate impact
Clean generation displaces grid power at 0.45 tCO₂/MWh. Generation estimated from capacity.
CO₂ avoided / yr
236,520 t
Over project life
5,913k t
Homes powered / yr
150,171
We hold no contact route for this project
This record comes from a public dataset, and that dataset does not publish a way to reach the developer. You can still register interest and we will tell you if that changes, but we will not pretend an introduction is available today.
If this is your project, claim the record and investors can reach you directly.
Is this your project?
This record is drawn from a public source. Claim it to correct it, state whether it is raising, and choose whether investors may be introduced to you. Nothing is published until we have checked it, and your contact details are never shown.
If you would rather not be listed at all, email hello@solandor.co and we will remove the record. No account, no form, and we do not ask why.
Claim this projectDeveloper site: www.gem.wiki/Mohammed_Bin_Rashid_Al_Maktoum_Solar_Park
The Capital Radar
Told when Mohammed Bin Rashid Al Maktoum Solar Park 5a changes
The Capital Radar goes out when the record moves: stages that shift, figures that are corrected, records that are added or retired across United Arab Emirates. Every number traced to the public dataset it came from.
Free. One click to leave, and we never pass your address on.
Questions about Mohammed Bin Rashid Al Maktoum Solar Park 5a
How big is Mohammed Bin Rashid Al Maktoum Solar Park 5a?+
Mohammed Bin Rashid Al Maktoum Solar Park 5a is recorded at 300 MW of solar capacity in Emirate of Dubai, United Arab Emirates. That figure is the one its source publishes, not an estimate by Solandor.
Where is Mohammed Bin Rashid Al Maktoum Solar Park 5a?+
Mohammed Bin Rashid Al Maktoum Solar Park 5a is in Emirate of Dubai, United Arab Emirates, at 24.7268, 55.4111. The coordinates are published by the source, so the location on the map is the site itself rather than a town centre standing in for it.
Who is behind Mohammed Bin Rashid Al Maktoum Solar Park 5a?+
The record names Dubai Electricity and Water Authority PJSC [100%] as the developer of Mohammed Bin Rashid Al Maktoum Solar Park 5a. That is what the published source says; Solandor holds no view on the ownership structure behind it and does not verify commercial control.
Is Mohammed Bin Rashid Al Maktoum Solar Park 5a operating?+
Mohammed Bin Rashid Al Maktoum Solar Park 5a is recorded at operational stage in United Arab Emirates. Stage comes from the source dataset and is re-checked against it; the page shows the date of the last check, so you can see how current that is.
Where does Solandor's information about Mohammed Bin Rashid Al Maktoum Solar Park 5a come from?+
This record is drawn from Global Energy Monitor, Global Solar Power Tracker, published at https://globalenergymonitor.org/projects/global-solar-power-tracker/. Solandor is a free public catalogue of clean energy projects and their funders; every field it holds is shown, including the ones the source leaves empty. Tell us if anything is wrong and we will correct it, and if you are Mohammed Bin Rashid Al Maktoum Solar Park 5a and would rather not be listed at all, say so and we will remove it.