Kurnool (SBG Cleantech) Ultra Mega Solar Park 3
SBG Cleantech Projectco Pvt Ltd [100%]
A solar project record in India on Solandor, a free database of clean energy projects and the investors who fund them across the Gulf, South Asia and South East Asia. Browse the full catalogue.
- Capacity
- 68 MW
- Technology
- Solar
- Stage
- Operational
- Country
- India
- Location
- Andhra Pradesh15.677, 78.290
- Developer
- SBG Cleantech Projectco Pvt Ltd [100%]
- Annual output
- not published
- Capex
- not published
- Capital sought
- not published
- Source
- Global Energy Monitor, Global Solar Power Tracker
- Last checked
- 10 Sept 2026
Every field this catalogue holds for the record is listed, including the ones its source leaves empty. A blank is a gap in the published source, not a gap in the record.
Ours is a public-source record. Claim it to correct anything above. Free, and your contact details are never shown.
About this project
68 MW solar facility at Andhra Pradesh, India currently operating. Owner: SBG Cleantech Projectco Pvt Ltd [100%]. Start year: 2017. Compiled from the Global Energy Monitor tracker; financial terms are not published and must be obtained from the developer. [possible duplicate of prj_kurnool (Kurnool Ultra Mega Solar Park), 0.88 km away, a different name within 2 km. 68 MW against 1000 MW. Check before publishing.]
Where this sits in the catalogue
This is one of 3 units recorded at this site, alongside Kurnool (SBG Cleantech) Ultra Mega Solar Park 1 and Kurnool (SBG Cleantech) Ultra Mega Solar Park 2. Each is held as its own record because each is separately reported. By capacity this is the 888th largest of the 2,445 solar records we hold in India. The country has 4,521 records in total across every technology. A further 23 catalogued projects sit within 25 km of it. See every record in India or find it on the map.
Investment readiness
What a financier can currently see about this project without asking a question. Not a view on the project itself.
No score is shown, because the public record carries too little to score one honestly. A low band here would describe what we do not know rather than anything about the project. The dimensions below are what the sources actually evidence, and the gaps are what a developer can close in a minute by claiming the record.
To become bankable
- Secure an offtake agreement (PPA) or named offtaker
- Secure site control (ownership or lease)
- Apply for grid connection / evacuation
- Provide developer track record / prior projects
- Add a CAPEX budget
- Add an expected annual generation estimate
Climate impact
Clean generation displaces grid power at 0.71 tCO₂/MWh. Generation estimated from capacity.
CO₂ avoided / yr
84,587 t
Over project life
2,115k t
Homes powered / yr
34,039
We hold no contact route for this project
This record comes from a public dataset, and that dataset does not publish a way to reach the developer. You can still register interest and we will tell you if that changes, but we will not pretend an introduction is available today.
If this is your project, claim the record and investors can reach you directly.
Is this your project?
This record is drawn from a public source. Claim it to correct it, state whether it is raising, and choose whether investors may be introduced to you. Nothing is published until we have checked it, and your contact details are never shown.
If you would rather not be listed at all, email hello@solandor.co and we will remove the record. No account, no form, and we do not ask why.
Claim this projectDeveloper site: www.gem.wiki/Kurnool_(SBG_Cleantech)_Ultra_Mega_Solar_Park
The Capital Radar
Told when Kurnool (SBG Cleantech) Ultra Mega Solar Park 3 changes
The Capital Radar goes out when the record moves: stages that shift, figures that are corrected, records that are added or retired across India. Every number traced to the public dataset it came from.
Free. One click to leave, and we never pass your address on.
Questions about Kurnool (SBG Cleantech) Ultra Mega Solar Park 3
How big is Kurnool (SBG Cleantech) Ultra Mega Solar Park 3?+
Kurnool (SBG Cleantech) Ultra Mega Solar Park 3 is recorded at 68 MW of solar capacity in Andhra Pradesh, India. That figure is the one its source publishes, not an estimate by Solandor.
Where is Kurnool (SBG Cleantech) Ultra Mega Solar Park 3?+
Kurnool (SBG Cleantech) Ultra Mega Solar Park 3 is in Andhra Pradesh, India, at 15.6765, 78.2901. The coordinates are published by the source, so the location on the map is the site itself rather than a town centre standing in for it.
Who is behind Kurnool (SBG Cleantech) Ultra Mega Solar Park 3?+
The record names SBG Cleantech Projectco Pvt Ltd [100%] as the developer of Kurnool (SBG Cleantech) Ultra Mega Solar Park 3. That is what the published source says; Solandor holds no view on the ownership structure behind it and does not verify commercial control.
Is Kurnool (SBG Cleantech) Ultra Mega Solar Park 3 operating?+
Kurnool (SBG Cleantech) Ultra Mega Solar Park 3 is recorded at operational stage in India. Stage comes from the source dataset and is re-checked against it; the page shows the date of the last check, so you can see how current that is.
Where does Solandor's information about Kurnool (SBG Cleantech) Ultra Mega Solar Park 3 come from?+
This record is drawn from Global Energy Monitor, Global Solar Power Tracker, published at https://globalenergymonitor.org/projects/global-solar-power-tracker/. Solandor is a free public catalogue of clean energy projects and their funders; every field it holds is shown, including the ones the source leaves empty. Tell us if anything is wrong and we will correct it, and if you are Kurnool (SBG Cleantech) Ultra Mega Solar Park 3 and would rather not be listed at all, say so and we will remove it.