Skip to content
← All projects

Kyee On Kyee Wa hydroelectric plant

Ministry of Agriculture, Livestock and Irrigation (Myanmar)

HydroOperational

A hydro project record in Myanmar on Solandor, a free database of clean energy projects and the investors who fund them across the Gulf, South Asia and South East Asia. Browse the full catalogue.

Record prj_gem_g100001027337Unverified
Capacity
74 MW
Technology
Hydro
Stage
Operational
Country
Myanmar
Location
Taungoo Township18.900, 96.221
Developer
Ministry of Agriculture, Livestock and Irrigation (Myanmar)
Annual output
not published
Capex
not published
Capital sought
not published
Source
Global Hydropower Tracker, Global Energy Monitor
Last checked
11 Sept 2026

Every field this catalogue holds for the record is listed, including the ones its source leaves empty. A blank is a gap in the published source, not a gap in the record.

Ours is a public-source record. Claim it to correct anything above. Free, and your contact details are never shown.

About this project

74 MW hydro facility at Taungoo Township, Myanmar currently operating. Owner: Ministry of Agriculture, Livestock and Irrigation (Myanmar). Start year: 2012. Compiled from the Global Energy Monitor tracker; financial terms are not published and must be obtained from the developer. [Published 12 Sep 2026 from the Global Hydropower Tracker, March 2026 release.]

Where this sits in the catalogue

By capacity this is the 42nd largest of the 67 hydro records we hold in Myanmar. The country has 84 records in total across every technology. A further 1 catalogued project sits within 25 km of it. See every record in Myanmar or find it on the map.

Investment readiness

What a financier can currently see about this project without asking a question. Not a view on the project itself.

No score is shown, because the public record carries too little to score one honestly. A low band here would describe what we do not know rather than anything about the project. The dimensions below are what the sources actually evidence, and the gaps are what a developer can close in a minute by claiming the record.

Offtake / PPANot stated
Site controlNot stated
Grid connectionNot stated
Financials & returnsReturns not yet modelled
DeveloperNot stated
Data completeness0/8 key inputs provided

To become bankable

  • Secure an offtake agreement (PPA) or named offtaker
  • Secure site control (ownership or lease)
  • Apply for grid connection / evacuation
  • Provide developer track record / prior projects
  • Add a CAPEX budget
  • Add an expected annual generation estimate

Climate impact

Clean generation displaces grid power at 0.50 tCO₂/MWh. Generation estimated from capacity.

CO₂ avoided / yr

129,648 t

Over project life

3,241k t

Homes powered / yr

74,085

We hold no contact route for this project

This record comes from a public dataset, and that dataset does not publish a way to reach the developer. You can still register interest and we will tell you if that changes, but we will not pretend an introduction is available today.

If this is your project, claim the record and investors can reach you directly.

Is this your project?

This record is drawn from a public source. Claim it to correct it, state whether it is raising, and choose whether investors may be introduced to you. Nothing is published until we have checked it, and your contact details are never shown.

If you would rather not be listed at all, email hello@solandor.co and we will remove the record. No account, no form, and we do not ask why.

Claim this project

Developer site: www.gem.wiki/Kyee_On_Kyee_Wa_hydroelectric_plant

The Capital Radar

Told when Kyee On Kyee Wa hydroelectric plant changes

The Capital Radar goes out when the record moves: stages that shift, figures that are corrected, records that are added or retired across Myanmar. Every number traced to the public dataset it came from.

Free. One click to leave, and we never pass your address on.

Questions about Kyee On Kyee Wa hydroelectric plant

How big is Kyee On Kyee Wa hydroelectric plant?+

Kyee On Kyee Wa hydroelectric plant is recorded at 74 MW of hydro capacity in Taungoo Township, Myanmar. That figure is the one its source publishes, not an estimate by Solandor.

Where is Kyee On Kyee Wa hydroelectric plant?+

Kyee On Kyee Wa hydroelectric plant is in Taungoo Township, Myanmar, at 18.9001, 96.2210. The coordinates are published by the source, so the location on the map is the site itself rather than a town centre standing in for it.

Who is behind Kyee On Kyee Wa hydroelectric plant?+

The record names Ministry of Agriculture, Livestock and Irrigation (Myanmar) as the developer of Kyee On Kyee Wa hydroelectric plant. That is what the published source says; Solandor holds no view on the ownership structure behind it and does not verify commercial control.

Is Kyee On Kyee Wa hydroelectric plant operating?+

Kyee On Kyee Wa hydroelectric plant is recorded at operational stage in Myanmar. Stage comes from the source dataset and is re-checked against it; the page shows the date of the last check, so you can see how current that is.

Where does Solandor's information about Kyee On Kyee Wa hydroelectric plant come from?+

This record is drawn from Global Hydropower Tracker, Global Energy Monitor, published at https://globalenergymonitor.org/projects/global-hydropower-tracker/. Solandor is a free public catalogue of clean energy projects and their funders; every field it holds is shown, including the ones the source leaves empty. Tell us if anything is wrong and we will correct it, and if you are Kyee On Kyee Wa hydroelectric plant and would rather not be listed at all, say so and we will remove it.