BluPine Energy on the record
10 project records across 1 country, 772 MW where capacity is stated. 410 MW is operating. Counted from records that each name their public source; nothing here is written by or for BluPine Energy.
- Records
- 10
- Capacity on record
- 772 MW
- Operating
- 410 MW
- 7 records
- Under construction
- —
- Countries
- 1
- Checked against owner
- 0
- not yet
Download these records as CSV (records from redistributable sources only; CC BY 4.0, attribute the source on each row). Is this your portfolio? Claim a record to correct it, add what is missing, or have it removed. Free, and your contact details are never shown.
Watch BluPine Energy. One email when a record here moves stage, is corrected, or is added or retired.
By country
| India | 10 | 772 MW |
By technology and stage
Largest BluPine Energy projects on record
Every record, by stage
Operating 2
- Karnataka (BluPine) solar farmIndia · 20 MW
- Madhya Pradesh (BluPine) solar farmIndia · 20 MW
Where these records come from
Licences and terms for each dataset are on the sources page. Solandor does not grade projects or developers; it counts what is published and links where.
Questions about BluPine Energy
How many clean energy projects does BluPine Energy have on record?+
10 records across 1 country name BluPine Energy as developer or owner, 772 MW in total where capacity is stated. 7 operating, 3 in development. Each record cites the public dataset it was taken from; ownership shares and consortium partners are on the record itself.
What is the largest BluPine Energy project on record?+
By stated capacity, Aland (BluPine) solar farm in India at 150 MW, in development. Solandor ranks by the capacity figure in the source record and does not adjust for ownership share, so a partner's stake in a joint project counts the whole project here.
Is this BluPine Energy's own list of projects?+
No. It is every record in a public catalogue that names BluPine Energy, compiled from the datasets listed on this page. BluPine Energy can claim any record free of charge to correct it, add what is missing, or have it removed; contact details never appear on the public site.