The pipeline
Projects seeking finance
5,500 records across the Gulf, South Asia and South East Asia, combining live raises with the operating asset base. Contact details are private; request an introduction from any detail page.
Solar · Operational
UnverifiedPaSP} Fortum O2
Developer undisclosed
88 GWh
annual output
50 MW
India
Solar · Operational
UnverifiedPaSP} Rattan
Developer undisclosed
88 GWh
annual output
50 MW
India
Solar · Operational
UnverifiedPaSP} Renew 1
Developer undisclosed
88 GWh
annual output
50 MW
India
Solar · Operational
UnverifiedPaSP} Tata D1
Developer undisclosed
88 GWh
annual output
50 MW
India
Solar · Operational
UnverifiedPaSP} Tata O1
Developer undisclosed
88 GWh
annual output
50 MW
India
Solar · Operational
UnverifiedPaSP} Tata O2
Developer undisclosed
88 GWh
annual output
50 MW
India
Solar · Operational
UnverifiedPalavalli
Developer undisclosed
88 GWh
annual output
50 MW
India
Solar · Operational
UnverifiedParli
Developer undisclosed
88 GWh
annual output
50 MW
India
Solar · Operational
UnverifiedPonnusangampatti
Developer undisclosed
88 GWh
annual output
50 MW
India
Solar · Operational
UnverifiedPunganur
Developer undisclosed
88 GWh
annual output
50 MW
India
Hydro · Operational
UnverifiedRammam
Developer undisclosed
236 GWh
annual output
50 MW
India
Solar · Operational
UnverifiedRajgarh - NTPC Solar Power Plant
National Thermal Power Corporation (NTPC)
88 GWh
annual output
50 MW
India
The Capital Radar
New projects, as they are recorded.
The Capital Radar lists what entered the catalogue since the last issue, each with the source it came from and the date it was last checked.
Free. One click to leave, and we never pass your address on.