Blawan Ijen geothermal project 3.0
Ormat Technology Inc [49%]; PT Medco Power Indonesia [51%]
A geothermal project record in Indonesia on Solandor, a free database of clean energy projects and the investors who fund them across the Gulf, South Asia and South East Asia. Browse the full catalogue.
- Capacity
- 76 MW
- Capital sought
- —
- Country
- Indonesia
- Location
- —
About this project
76 MW geothermal power project in Indonesia (unknown type), at announced stage. Owner: Ormat Technology Inc [49%]; PT Medco Power Indonesia [51%]. Compiled from the Global Geothermal Power Tracker, Global Energy Monitor, March 2026 release; financial terms are not published and must be obtained from the developer.
Climate impact
Clean generation displaces grid power at 0.76 tCO₂/MWh. Generation estimated from capacity.
CO₂ avoided / yr
379,483 t
Over project life
9,487k t
Homes powered / yr
142,663
Interested in funding this project?
Request an introduction. We review each request. The developer's contact details stay private until both sides agree to connect.