Skip to content
← All projects

Tadweer Al Ain Waste Incinerator power station 1.0

Tadweer Waste Treatment LLC [100%]

Unverified
Bioenergy
Concept
Awaiting its first re-check against source

A bioenergy project record in United Arab Emirates on Solandor, a free database of clean energy projects and the investors who fund them across the Gulf, South Asia and South East Asia. Browse the full catalogue.

Capacity
60 MW
Capital sought
Country
United Arab Emirates
Location
Al Ain

About this project

60 MW bioenergy power project in United Arab Emirates (bioenergy: refuse (municipal and industrial wastes)), at announced stage. Owner: Tadweer Waste Treatment LLC [100%]. Start year: 2027.0. Compiled from the Global Bioenergy Power Tracker (V3), Global Energy Monitor, September 2025 release; financial terms are not published and must be obtained from the developer.

Climate impact

Clean generation displaces grid power at 0.45 tCO₂/MWh. Generation estimated from capacity.

CO₂ avoided / yr

47,304 t

Over project life

1,183k t

Homes powered / yr

30,034

Interested in funding this project?

Request an introduction. We review each request. The developer's contact details stay private until both sides agree to connect.

Source: Global Bioenergy Power Tracker — Global Energy Monitor

Last checked: · Last updated: 31 Aug 2026 · flagged stale, treat figures as historical until re-verified

Information only. Not financial advice. We are not a broker and do not hold funds or securities. All introductions happen off-platform and at the parties' own risk.